1. New clinic construction same size as it is now, concrete floor, brick walls, floor on stilts, rebars, thin roof, wood structure for roof, bathroom.
Electricity, Finished cost US $18,300.
2. New clinic construction double of the actual size, concrete floor on stilts, brick walls, rebars, thin roof, wood structure for roof, bathroom,
Electricity, Finished cost US $29,800.00
3. Actual wooden construction clinic fixing, materials, work, paint, concrete stilts to strength the structure...US $4,200.00
4. Two fresh water wells at San Pedro village with hand pump...US $5,000.00
5. A fresh water well at Bombonaje village with hand pump...US $2,500.00
6. A fresh water well at secondary school Cabo Pantoja village with hand pump...US $2,500.00
7. Two book cabinets for San Juan school...US $760.00
8. Two book cabinets for CaboPantoja School.... US $760.00
9. Book cabinet for clinic at San Juan...US $380.00
10. Cabo pantoja school fixing and painting...US $1,200.00
11. Cabo Pantoja new construction modulo for sciences and computer studies, concrete, brick walls, wooden roof structure, thin roof, cement
floor on ground, electricity, Finished cost US $16,750.00
12. Power generator.......US $1,250.00