Project VistaPeru - A Humanitarian Service Project

Project Cost:


1. New clinic construction same size as it is now, concrete floor, brick walls, floor on stilts, rebars, thin roof, wood structure for roof, bathroom.
Electricity, Finished cost US $18,300.

2. New clinic construction double of the actual size, concrete floor on stilts, brick walls, rebars, thin roof, wood structure for roof, bathroom,
Electricity, Finished cost US $29,800.00

3. Actual wooden construction clinic fixing, materials, work, paint, concrete stilts to strength the structure...US $4,200.00

4. Two fresh water wells at San Pedro village with hand pump...US $5,000.00

5. A fresh water well at Bombonaje village with hand pump...US $2,500.00

6. A fresh water well at secondary school Cabo Pantoja village with hand pump...US $2,500.00

7. Two book cabinets for San Juan school...US $760.00

8. Two book cabinets for CaboPantoja School.... US $760.00

9. Book cabinet for clinic at San Juan...US $380.00

10. Cabo pantoja school fixing and painting...US $1,200.00

11. Cabo Pantoja new construction modulo for sciences and computer studies, concrete, brick walls, wooden roof structure, thin roof, cement
floor on ground, electricity, Finished cost US $16,750.00

12. Power generator.......US $1,250.00

 

Star Peru

 

 

 

 

 

What you can
do in 2009:

 

 

 

Experiences

 

"In this dream, I have traveled many miles to a small village in Peru. To this underprivileged community, I gave a school, my efforts, and my compassion; yet it was I who received the most."

- Ashley Walker, 2007 participant

 

 

"Because of this trip, a part of my heart will always be in Peru. The smells and sounds resound in my head forever. I dodn't expect it, but the trip changed me; it changed us all."

-Jackie Stacey, 2007 participant